Guides / Lockout/Tagout Requirements

Lockout/Tagout Requirements (29 CFR 1910.147) for Small Employers

⏰ OSHA HazCom deadline — November 20, 2026: employers must update their workplace labels, written HazCom program, and employee training to the new GHS format by then. Check your program free — 2-minute self-audit →
Published October 10, 2026 · Regulations checked October 10, 2026 on eCFR and osha.gov

Short answer: if your employees clean, unjam, adjust, repair or maintain machines that could start up or release stored energy while they work, OSHA’s lockout/tagout standard, 29 CFR 1910.147, applies, whatever the size of the business. You need a written energy control program, machine-specific procedures (with one narrow exception), training with a signed certification, and an inspection of each procedure at least once a year. Checked against the current text on eCFR on October 10, 2026.

A note on who wrote this. SDSentry is safety data sheet and Hazard Communication software. It is not lockout/tagout software and does not manage lock procedures or inspections. We wrote this guide because the shops we serve, auto repair, machine shops, janitorial and maintenance contractors, labs, are the same employers OSHA cites for both standards. The outlines below are free to print, and they are an outline, not legal advice.

1. Why a HazCom company is writing about lockout/tagout

OSHA publishes a list of the standards it cites most often after federal inspections. On its Top 10 Most Frequently Cited Standards page (checked October 10, 2026), the preliminary list for Fiscal Year 2026 (October 1, 2025 to August 31, 2026) ranks:

  1. Fall Protection, general requirements (construction), 1926.501
  2. Hazard Communication, general industry, 1910.1200
  3. Control of Hazardous Energy (lockout/tagout), general industry, 1910.147

The rest of that list includes respiratory protection (1910.134, sixth), powered industrial trucks (1910.178, seventh) and machine guarding (1910.212, tenth). For a general-industry shop, HazCom and lockout/tagout are the two most-cited standards on the list. If you are fixing one, it is worth checking the other. Our HazCom guides start at does HazCom apply to small businesses and the most-cited HazCom violations.

2. Scope: who and what 1910.147 covers

The standard covers “the servicing and maintenance of machines and equipment in which the unexpected energization or start up of the machines or equipment, or release of stored energy could cause injury to employees” (1910.147(a)(1)(i)). Energy means electrical, mechanical, hydraulic, pneumatic, chemical, thermal or any other source (“energy source”, 1910.147(b)). Servicing and maintenance include setting up, adjusting, inspecting, lubricating, cleaning, unjamming and tool changes.

Not covered at all (1910.147(a)(1)(ii)):

Normal production work is generally covered by machine guarding (Subpart O), not 1910.147. Servicing during production is covered if an employee removes or bypasses a guard, or puts any part of the body into the point of operation or an associated danger zone (1910.147(a)(2)(ii)). A note to that paragraph excludes minor tool changes and adjustments that are “routine, repetitive, and integral to the use of the equipment for production”, but only where alternative measures give effective protection.

Two specific exceptions (1910.147(a)(2)(iii)):

3. The written energy control program ((c)(1))

“The employer shall establish a program consisting of energy control procedures, employee training and periodic inspections” so that, before servicing, the machine “shall be isolated from the energy source, and rendered inoperative” (1910.147(c)(1)). The program is those three parts together: procedures, training, inspections. The employer also supplies the locks, tags and other hardware ((c)(5)(i)); devices must be durable, standardized by color, shape or size, substantial, and identify the employee who applied them ((c)(5)(ii)).

4. Lockout or tagout? ((c)(2)–(3))

Push buttons, selector switches and other control-circuit devices are not energy isolating devices (1910.147(b)). Hitting the stop button is a shutdown, not a lockout.

5. Machine-specific procedures, and the documentation exception ((c)(4))

“Procedures shall be developed, documented and utilized for the control of potentially hazardous energy” (1910.147(c)(4)(i)). Each procedure must clearly set out its scope, purpose, authorization, rules and techniques, and at least ((c)(4)(ii)):

The documentation exception. The note to (c)(4)(i) says you need not document the procedure for a particular machine when all eight of these are true:

  1. no potential for stored or residual energy, or reaccumulation of it, after shutdown that could endanger employees;
  2. a single energy source that can be readily identified and isolated;
  3. isolating and locking out that source completely de-energizes and deactivates the machine;
  4. the machine is isolated and locked out during servicing or maintenance;
  5. a single lockout device achieves a locked-out condition;
  6. the lockout device is under the exclusive control of the authorized employee doing the work;
  7. the work does not create hazards for other employees; and
  8. the employer has had no accidents involving unexpected activation or re-energization of that machine during servicing or maintenance.

The exception removes the paperwork for that machine, not the lockout itself, the training or the annual inspection. Most production machines in a machine shop, with air, hydraulics, spring-loaded or gravity-loaded parts, fail at least one of the eight.

6. The six steps of applying energy control ((d))

Paragraph (d) requires the procedure to cover these elements “in the following sequence”:

  1. Preparation for shutdown ((d)(1)): the authorized employee knows the type and magnitude of the energy, its hazards and how to control it.
  2. Machine or equipment shutdown ((d)(2)): an orderly shutdown using the established procedure.
  3. Isolation ((d)(3)): every energy isolating device needed is located and operated to isolate the machine.
  4. Lockout or tagout device application ((d)(4)): authorized employees affix devices to each isolating device, locks holding it in the “safe” or “off” position.
  5. Stored energy ((d)(5)): stored or residual energy is relieved, disconnected, restrained or otherwise rendered safe, and verification continues if it could reaccumulate.
  6. Verification of isolation ((d)(6)): before starting work, the authorized employee verifies that isolation and de-energization have been accomplished.

Affected employees must be notified before the controls are applied and after they are removed (1910.147(c)(9)), and only the authorized employees doing the servicing may apply them ((c)(8)).

7. Release from lockout or tagout ((e))

Paragraph (f) adds rules for temporary removal to test or position a machine, outside contractors, group lockout and shift changes.

8. Periodic inspection, at least annually ((c)(6))

“The employer shall conduct a periodic inspection of the energy control procedure at least annually” (1910.147(c)(6)(i)). The inspector is an authorized employee other than the ones using the procedure being inspected. Where lockout is used, the inspection includes a review with each authorized employee of their responsibilities; where tagout is used, the review covers each authorized and affected employee and the limitations of tags in (c)(7)(ii). The employer certifies each inspection, identifying the machine, the date, the employees included and the person who inspected ((c)(6)(ii)). The checklist in section 11 is built around those elements.

9. Training for authorized, affected and other employees ((c)(7))

WhoWhat the standard requires
Authorized employees (they lock out and service)Recognition of applicable hazardous energy sources, the type and magnitude of energy in the workplace, and the methods and means of isolation and control ((c)(7)(i)(A)).
Affected employees (they operate or work near the machine)The purpose and use of the energy control procedure ((c)(7)(i)(B)).
All other employees who work, or may work, where procedures are usedThe procedure, and the prohibition on attempting to restart or re-energize locked or tagged-out machines ((c)(7)(i)(C)).
Everyone, where tagout is usedThe six limitations of tags in (c)(7)(ii), including that tags are warning devices without the physical restraint of a lock.

Retraining is required for authorized and affected employees after a change in job assignment, a change in machines, equipment or processes that presents a new hazard, or a change in the procedures, and whenever an inspection or other information shows deviations or gaps ((c)(7)(iii)). Certification: “The employer shall certify that employee training has been accomplished and is being kept up to date. The certification shall contain each employee’s name and dates of training” ((c)(7)(iv)).

This is the same pattern as HazCom training: the record of who was trained, on what, and when is what an inspector asks for. See HazCom training requirements for the chemical side.

10. Printable outline: machine-specific lockout procedure

A fill-in outline that follows the elements of (c)(4)(ii) and the sequence in (d) and (e). OSHA’s own non-mandatory Appendix A to 1910.147 is a longer “typical minimal lockout procedure” you can adapt. This is an outline, not legal advice; check it against the machine and its manufacturer’s instructions.

Lockout procedure for:   (machine name, ID/asset number, location)

Intended use (c)(4)(ii)(A): this procedure is used when   (tasks, e.g. blade change, clearing jams, cleaning)

Authorized employees (by name or job title):  

Affected employees and how they are notified (c)(9):  

Energy sources (type and magnitude, e.g. 480 V 3-phase, 90 psi air, hydraulic accumulator, spring, gravity, thermal):  

  1. Prepare (d)(1): review energy types, hazards and controls above.
  2. Shut down (d)(2): normal stopping method  
  3. Isolate (d)(3): each isolating device and its location (disconnect, valve, block)  
  4. Apply locks/tags (d)(4): number and type of devices  ; tagout only if (c)(2)–(3) allow.
  5. Release stored energy (d)(5): method (bleed air, block ram, discharge capacitor, let cool)  
  6. Verify isolation (d)(6), (c)(4)(ii)(D): test method (try start, meter test)  ; return controls to off.

Release from lockout (e): tools and items cleared; guards replaced; employees clear; affected employees notified; each lock removed by the person who applied it.

Removal when the applier is absent (e)(3): reference to the employer’s documented procedure  

Group lockout / shift change / contractors (f)(2)–(4), if applicable:  

Prepared by   Date   Reviewed  

11. Printable checklist: annual periodic inspection (c)(6)

One sheet per energy control procedure, at least once a year. Not legal advice.

Machine or equipment (c)(6)(ii):   Procedure ID  

Date of inspection:   Inspector (authorized employee who does not use this procedure, (c)(6)(i)(A)):  

Employees included:  

Certified by   Date  

SDSentry handles the other most-cited standard. It does not do lockout/tagout. It keeps your Hazard Communication paperwork in one place: a per-location safety data sheet library your people can reach, GHS secondary-container labels, the written HazCom program and HazCom training records. Start a free trial, or run the free 2-minute HazCom self-audit first.

Sources (checked October 10, 2026)

Educational information, not legal advice. Quotations and citations are from the current text of 29 CFR 1910.147 on eCFR and from osha.gov, both checked October 10, 2026. State Plan states can have their own lockout/tagout rules; check your state’s program, and confirm anything that matters for your business against the regulation itself.

Start with the chemical list
A HazCom program starts from a list of the hazardous chemicals at your site. Download the free chemical inventory list template as a CSV for Excel or Google Sheets, or as a printable PDF. Free, no signup.
Get the free chemical inventory template →

Frequently asked questions

Does lockout/tagout apply to a small shop?

Yes, if your employees service or maintain machines or equipment where unexpected energization, start up or release of stored energy could injure them. 29 CFR 1910.147 has no minimum employee count. It does not cover construction or agriculture employment, maritime work under parts 1915, 1917 and 1918, electric utility generation, transmission and distribution installations, electrical hazards covered by Subpart S, or oil and gas well drilling and servicing (1910.147(a)(1)(ii)).

Do I need lockout/tagout for cord-and-plug equipment?

Not if unplugging controls the hazard and the plug stays under the exclusive control of the employee doing the servicing or maintenance. That exception is at 29 CFR 1910.147(a)(2)(iii)(A). If anyone else could plug it back in while the employee is working, or the equipment has stored energy that unplugging does not remove, the exception does not fit.

Does every machine need its own written lockout procedure?

Procedures must be developed, documented and used under 29 CFR 1910.147(c)(4)(i). The note to that paragraph lets you skip documenting the procedure for a particular machine only when all eight listed conditions are met, including a single readily identified energy source, no stored or residual energy, a single lockout device under the exclusive control of the authorized employee, and no prior accidents involving unexpected activation of that machine during servicing.

How often does OSHA require a lockout/tagout inspection?

At least annually. 29 CFR 1910.147(c)(6) requires a periodic inspection of each energy control procedure at least once a year, performed by an authorized employee other than the ones using the procedure being inspected, and the employer must certify it with the machine, the date, the employees included and the inspector.

What lockout/tagout training does OSHA require?

Authorized employees are trained to recognize hazardous energy sources, the type and magnitude of energy, and the methods of isolation and control; affected employees are instructed in the purpose and use of the procedure; all other employees who work where the procedures may be used are told about the procedure and the prohibition on restarting locked or tagged equipment (1910.147(c)(7)(i)). Retraining is required after changes in jobs, equipment, processes or procedures, and the employer certifies training with each employee's name and dates (1910.147(c)(7)(iii)-(iv)).

Is lockout/tagout one of OSHA's most-cited standards?

Yes. OSHA's Top 10 Most Frequently Cited Standards page, checked October 10, 2026, lists Control of Hazardous Energy (lockout/tagout), 29 CFR 1910.147, third in its preliminary list for Fiscal Year 2026 (October 1, 2025 to August 31, 2026), directly behind Hazard Communication, 29 CFR 1910.1200, in second place.

Does SDSentry do lockout/tagout?

No. SDSentry is safety data sheet and OSHA Hazard Communication software: a per-location SDS library, GHS secondary-container labels, a written HazCom program and HazCom training records. It does not write or store lockout procedures or track lock inspections. The outlines on this page are free to print and adapt.


Most SDS software stops at the safety data sheets. OSHA HazCom asks an employer for five things: a written program, a chemical list, container labels, SDS access and employee training. SDSentry covers all five in one product and builds the written program from your own chemical list. See how 11 SDS tools compare on all five →

SDSentry keeps your SDS library, GHS labels and HazCom training records in one place — OSHA deadline price: $24 per location a month, or $199 a year (regularly $49). Start by November 20, 2026 to lock it in.

Unlimited users and no SDS cap. On an annual plan that is less than any paid SDS tool we compared.

Start 7-day free trial Compare SDS software prices →